dc.contributor.advisor | Koelling, C. Patrick | |
dc.contributor.author | Lewis, John Russell | |
dc.date.accessioned | 2015-09-08T18:12:33Z | |
dc.date.available | 2015-09-08T18:12:33Z | |
dc.date.issued | 1985-05-01 | |
dc.identifier.uri | https://hdl.handle.net/11244/17366 | |
dc.description.abstract | A simulation in SLAM and an analytical computer program called CAN-Q were used to study the feasibility-of adding cranes to the cleaning and lubing tanks at Southwest Tube Manufacturing. A comparison is made of the trade-offs and difficulties in using SLAM and CAN-Q in the study. This is accomplished by comparing outputs of both programs, determining confidence intervals and comparing this data with the actual system. A cost analysis is also done on the feasibility of adding the cranes to the tanks. | |
dc.format | application/pdf | |
dc.language | en_US | |
dc.publisher | Oklahoma State University | |
dc.rights | Copyright is held by the author who has granted the Oklahoma State University Library the non-exclusive right to share this material in its institutional repository. Contact Digital Library Services at lib-dls@okstate.edu or 405-744-9161 for the permission policy on the use, reproduction or distribution of this material. | |
dc.title | Use of Simulation and Can-q to Analyze the Cleaning and Lubricating Processes of Cold Drawn Tubing | |
dc.type | text | |
dc.contributor.committeeMember | Wolfe, Philip M. | |
dc.contributor.committeeMember | Estes, Carl B. | |
osu.filename | Thesis-1985-L674u.pdf | |
osu.accesstype | Open Access | |
dc.description.department | Industrial Engineering | |
dc.type.genre | Thesis | |