Subgrade moisture variations interim report II Access Tube Installation

dc.contributor.sponsorOklahoma Department of Transportation. Materials and Research Division. Office of Research & Implementation
dc.creatorHellger, Wayne L.
dc.creatorHaliburton, Allan T.
dc.date.accessioned2019-04-05T16:48:36Z
dc.date.available2019-04-05T16:48:36Z
dc.description.abstractA method for field installation of access tubes for nuclear depth moisture and density equipment is described. After review of previous installation methods, it was concluded that a special drilling unit was required to auger the heavy clays encountered in Oklahoma. The equipment is described in detail, as is the exact procedure used in field installation of access tubes beneath highway pavements. Using the equipment and methods described in this report, 30 test sites of three access tubes each were installed during the summer of 1966. More test sites are planned for future installation.
dc.description.peerreviewNo
dc.description.versionInterim Report II
dc.format.extent59 pages
dc.format.extent23,566,704 bytes
dc.format.mediumapplication.pdf
dc.identifier.govdocFHWA-OK
dc.identifier.otherOklahoma Department of Transportation State Planning and Research
dc.identifier.urihttps://hdl.handle.net/11244/317855
dc.languageen_US
dc.relation.ispartofseriesNo
dc.relation.requiresAdobe Acrobat Reader
dc.titleSubgrade moisture variations interim report II Access Tube Installation
dc.typeTechnical Report
dc.type.materialtext

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
64-01-3 Subgrade moisture variations interim report II Access Tube Installation.pdf
Size:
22.47 MB
Format:
Adobe Portable Document Format