Search
Now showing items 1-2 of 2
Evaluation of continuously reinforced concrete pavement
(1976-5)
This report compares the performance of continuously reinforced concrete pavement with and with transverse steel. The construction of a CRCP project without transverse steel was done at the insistence of the Division FHWA ...
Slurry seal crack treatment
(1976-5)
In the spring of 1975 the resurfacing project 1-35-3(88)126 was started. The experimental part of the project consisted of the use of an asphalt slurry to fill and seal cracks and spalls in the existing pavement, followed ...