Search
Now showing items 1-9 of 9
Scour around bridge piers in Oklahoma streams (FHWA-87-2) 2150
(1987-3)
This study consisted of a hydrographic survey and determined maximum scour
around the piers at eighteen selected bridges on the Cimarron, Arkansas, and Caney
Rivers. The survey was performed soon after the 50- to I ...
Roadside development and erosion control (FHWA-OK-87-5)
(1987-6)
The information contained within this report addresses: 1) Implementation
of roadside development and erosion control results, 2) Herbicide evaluation
for the effective and economical eradication of undesirable roadside ...
Oklahoma pavement management system phase I - development of specifications (87-09)
(1987-12)
This report documents the first phase of the development of
the Oklahoma Department of Transportation's (ODOT) pavement
management system. Although much as been written on the pavement
management process, little literature ...
Experimental products and equipment for highway construction and maintenance annual report January 1987 (FHWA-OK-87-02) 2700
(1987-1)
This is a l isting pertaining to the status of the research evaluation of
products and equipment which may possibly be used in highway construction
or maintenance by the Oklahoma Department of Transportation.
Products ...
Experimental study of two prestressed steel beam-concrete slab bridge units (FHWA-OK-87-1)
(1987-5)
The behavior of two 55 ft. long prestressed, composite steel beamconcrete
slab bridge units was studied. The type of unit tested is currently
used in county road bridge construction, where the use of prefabricated units ...
Feasibility of using fly ash as binder in coarse and fine aggregates for bases (FHWA-OK-86-8) 2125
(1987-6)
Aggregate-fly ash mixes consisting of fine aggregate
bases (FAB), coarse aggregate bases (CAB) and Class C fly ash
additions of 15, 25 .and 35% were tested in compressive and
flexural strength for curing periods of up ...
Construction and performance of the stabilized base course on U.S. 77 Ponca City, Kay County (FHWA-OK-87-7) 2128
(1987-7)
This study investigates the field implementation of shale stabilization on an experimental project. A number of test sections were set on the south bound lane of U.S. Highway 77, north of Ponca City, Kay County, Oklahoma. ...
Experimental investigation of skewed elastomeric expansion bridge bearings (FHWA-OK-87-3)
(1987-4)
Twelve skewed elastomeric expansion bridge bearings were supplied by the Oklahoma Department of Transportation. To evaluate the performance of these skewed bearings, the following six phases of testing were conducted on ...
Fabric form with cement fly ash mixture for erosion and sediment control (FHWA-OK-87-8) 2114
(1987-12)
A study was c on duc t ed in Ok l ahoma in 1 98 3 t o det ermine
the p erformanc e o f f abr i c form mats fi l led with different
prop o r t i ons o f f ly ash c ement grout mixtures . They were
used to r epair a 2 8 ...