Search
Now showing items 1-4 of 4
Hot recycling of asphalt pavement (FHWA-OK-82-4) 405
(1982-10)
The objective of this report is to evaluate the feasibilitly and benefit of utilizing asphalt pavement hot recycling in Oklahoma. The work began in April, 1980 and lasted through June 1980. The 8 1/2 mile (13.6 km) project ...
The evaluation of non-woven fabrics - petromat and mirafi (FHWA-OK-82-6) 2278
(1982-5)
The objective of this report is to study non-woven Thermoplastic fiber fabrics and their effects in eliminating and diminishing reflective cracking in asphalt concrete overlays. Two fabrics, namely Petromat and Mirafi 140, ...
Polymer concrete overlay on SH 51 bridge deck (80-03-1)
(1982-6)
This report discusses OKLAHOMA's first polymer concrete bridge deck
overlay. The objective of this project was to place a thin resinous
overlay on a sound bridge deck and evaluate its performance over one
year using various ...
Discarded tires in highway construction (FHWA-OK-82-4) 2411
(1982-11)
This report discusses a single bituminous surface treatment using an asphalt-rubber binder and pre-coated aggregate over a bleeding and cracked asphalt concrete highway. Tests and evaluations include: a pavement condition ...