Search
Now showing items 1-1 of 1
Evaluation of Bonded Overlay and Dowel Bar Retrofit on I-40 (FHWA-OK-02-02 2404)
(2001-8)
In October, 1998, The Oklahoma Department of Transportation (ODOT) constructed a 1,000 foot long, experimental section of fiber-reinforced PCC overlay over an existing jointed concrete roadway. The ODOT Research and ...