Search
Now showing items 1-8 of 8
Breaking and seating - final report (OK-95-05)
(1995-10)
A preliminary investigation of lJS 169 in Nowata county was completed in June 1988. The 9.9 km (6.2 mi) section of two-lane roadway is located 8.0 km (5.0 mi) north of the city of Nowata. The majority of the 4.5 m ( 15.0 ...
Establishment of underdrain maintenance procedures (FHWA-OK-95-04) 2183
(1995-5)
Project #2183 analized the condition of underdrains and developed a method of classifying, maintaining, and, en necessary, replacing underdrain outlets. The project encompassed every region of Oklahoma and many different ...
Breaking and seating - final report
(1995-10)
A preliminary investigation of lJS 169 in Nowata county was completed in June 1988. The 9.9 km (6.2 mi) section of two-lane roadway is located 8.0 km (5.0 mi) north of the city of Nowata. The majority of the 4.5 m ( 15.0 ...
Field performance evaluation of self-levelling sealants Dow-Corning 888-SL and 890-SL (FHWA-OK-95) 2700
(1995-4)
The Oklahoma Department of Transportation (ODOT) has recently completed a field performance evaluation of Dow-Corning' s (DC) self- levelling sealants 888-SL and 890-SL. The evaluation was conducted on three new construction ...
Experimental products and equipment for highway construction and maintenance (FHWA-OK-95-01) 2700
(1995-2)
THIS PUBLICATION CONSTITUTES A LISTING OF EXPERIMENTAL PRODUCTS AND EQUIPMENT THAT ARE BEING CONSIDERED OR EVALUATED BY THE -, OKLAHOMA DEPARTMENT OF TRANSPORTATION, OTHER TRANSPORTATION DEPARTMENTS, OR OTHER AGENCIES. THE ...
Statistical models for identification of problematic bridge sites and estimation of approach settlements (FHWA-OK-94-02) 2188
(1995-5)
Bridge approach settlement is caused by the differential movements of the bridge abutment and the approach pavement. The resulting unsafe riding surface not only requires frequent and costly maintenance but also leads to ...
FEABAS A user friendly software for prediction of bridge approach settlement (FHWA-OK-95-03) 2188
(1995-5)
Bridge approach settlement is a major problem in highway design as well as maintenance. It creates an unsafe and uncomfortable riding surface. This report presents the details of a software that was developed at the ...
Establishment of underdrain maintenance procedures (FHWA-OK-95-04)
(1995-5)
Project #2183 analyzed the condition of underdrains and developed a method of classifying, maintaining, and, when necessary, replacing underdrain outlets. The project encompassed every region of Oklahoma and many different ...