Performance of experimental approach embankments at Salt Fork river bridges on U.S. 177 (FHWA-97-04) 2195
(1997-6)
In an effort to address the bump at the endˆ of the bridge problem, ODOT has undertaken an experimental construction research project to evaluate five different approach embankment construction methods. The research is ...
Statistical models for identification of problematic bridge sites and estimation of approach settlements (FHWA-OK-94-02) 2188
(1995-5)
Bridge approach settlement is caused by the differential movements of the bridge abutment and the approach pavement. The resulting unsafe riding surface not only requires frequent and costly maintenance but also leads to ...
FEABAS A user friendly software for prediction of bridge approach settlement (FHWA-OK-95-03) 2188
(1995-5)
Bridge approach settlement is a major problem in highway design as well as maintenance. It creates an unsafe and uncomfortable riding surface. This report presents the details of a software that was developed at the ...