Now showing items 1-1 of 1

    • Slurry seal crack treatment 

      Kidd II, E.B.; Thompson, L.G. (1976-5)
      In the spring of 1975 the resurfacing project 1-35-3(88)126 was started. The experimental part of the project consisted of the use of an asphalt slurry to fill and seal cracks and spalls in the existing pavement, followed ...