STEAM, Edmond, OK
Abstract
The first six weeks of the semester, students were required to work in small teams for the schematic design phase of the project. Attached is a preview of my team's SD presentation slides. After that, we split up and I focused on my own design, which was mainly focused on structure, but also included architectural concepts, lighting design, HVAC design, etc. Finally, I created construction documents for the project that I designed.