Show simple item record

dc.contributor.authorMcCutchan, Aubrey
dc.contributor.authorBrooks, Matt
dc.contributor.authorAtoufi, Hossein
dc.date.accessioned2018-11-21T21:24:59Z
dc.date.available2018-11-21T21:24:59Z
dc.date.issued2017-12-12
dc.identifieroksd_mccutchan_HT_2017
dc.identifier.urihttps://hdl.handle.net/11244/302120
dc.description.abstractThis reports details upgrades to the Alligator Creek wastewater treatment plant in Texas to meet new flow requirements and various permit limits. We evaluated the current performance of the plant systems to determine if they needed to be enhanced and designed the necessary changes. Alternatives taking into account advantages and disadvantages were also evaluated to determine the best solution, which oftentimes resulted in no changes or simply adding additional units to an already existing process.
dc.formatapplication/pdf
dc.languageen_US
dc.rightsCopyright is held by the author who has granted the Oklahoma State University Library the non-exclusive right to share this material in its institutional repository. Contact Digital Library Services at lib-dls@okstate.edu or 405-744-9161 for the permission policy on the use, reproduction or distribution of this material.
dc.titleCIVE 4143 senior design project
osu.filenameoksd_mccutchan_HT_2017.pdf
osu.accesstypeOpen Access
dc.type.genreHonors Thesis
dc.type.materialText
thesis.degree.disciplineCivil and Environmental Engineering
thesis.degree.grantorOklahoma State University


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record