Now showing items 1-4 of 4

    • Development of an Improved System for Contract Time Determination 

      Atreya, Siddharth (Oklahoma State University, 2007-05-01)
      Contract time, is the maximum time allowed for completion of all work described in contract documents. The determination of contract time affects not only the actual duration of the construction project, but also such ...
    • Multi-parameter bidding in highway construction and rehabilitation projects 

      Abdollahipour, Saeed (2013-05)
      According to the 2013 ASCE infrastructure report card, roads have been given a grade of D. In addition, the level of federal, state, and local capital investment is insufficient and projected to result in a farther decline ...
    • Performance Assessment of Ongrade Horizontal Directional Drilling Method 

      Burman, Reeti R. (Oklahoma State University, 2009-05-01)
      Horizontal Directional Drilling has been widely accepted and used for installing gas, water lines, telecommunication cables, etc. One area where HDD has achieved limited success is in the installation of gravity flow sewer ...
    • Validation of the Coredry(Tm) and Corereader(Tm) Appratus 

      Pokhrel, Gyanendra (Oklahoma State University, 2007-12-01)
      The evaluation of CoreDry�, and CoreReader� apparatus was based on the test results of laboratory prepared ODOT S3, S4 and SMA mixes and field cores of 100 mm and 150 mm. The CoreDry� apparatus was evaluated by comparing ...