Browsing OU - Oklahoma Transportation Resources / Oklahoma Transportation Library by Subject "Rutting"
Now showing items 1-6 of 6
-
Creep Compliance and Percent Recovery of Oklahoma Certified Binders Using the Multiple Stress Creep Recovery (MSCR) Method
(Oklahoma City, OK : Oklahoma Department of Transportation, 2015., 2015-04)A laboratory study was conducted to develop guidelines for the Multiple Stress Creep Recovery (MSCR) test method for local conditions prevailing in Oklahoma. The study consisted of commonly used binders in Oklahoma, namely ... -
Evaluation of Oklahoma pavement design procedures (FHWA-OK-85-01)
(1985-8)This report covers the results of Phases II and III of the research project. Based upon the findings of this study, recommendations were made for possible improvement of the currently used design and management procedures. ... -
Evaluation of oklahoma pavement design procedures - final report (84-60)
(1985-4)This report covers the results of Phases II and lII of the research project. Based upon the findings of this study, recornmendations were made for possible improvement of the currently used design and management procedures. ... -
Evaluation of Oklahoma pavement design procedures phase I - interim report (84-60)
(1984-12)This report covers collection of pavement conditions and other pertinent performance data for 6 representative pavement sites that have failed prematurely and 2 sites which have performed as intended. Interviews of Oklahoma ... -
Evaluation of rutting potential of hot mix asphalt using the asphalt pavement analyzer
(October, 2)A comprehensive study involving rut potential of Hot Mix Asphalt (HMA) was conducted. Both cylindrical and beam specimens of HMA were prepared using a Superpave Gyratory Compactor (SGC) and an Asphalt Vibratory Compactor ... -
LONG TERM PAVEMENT PERFORMANCE MONITORING OF SIX LTPP SPS-10 SECTIONS IN OKLAHOMA WITH 3D LASER IMAGING (FHWA-OK-19-05 2115)
(2019-12)Under the LTPP Specific Pavement Study 10 (SPS-10) experiment initiative, the Oklahoma Department of Transportation (ODOT) constructed five warm mix asphalt (WMA) testing sections and one hot mix asphalt (HMA) control ...